Logo

Fort Myer Construction Corp.

Share

Washington, DC 20018

Company Info

  • Est. 1972
  • Annual Vol Not Provided

Featured Project Return to Projects List

Anacostia River Tunnel at RFK Stadium

Project Information

Project Location:
Washington, DC
Approx Contract:
$5,300,000
Status:
Completed - Aug 2014
Structure Type:
Tunnel

References

Owner:
Impregilo Healy Parsons JV
Architect:
General Contractor:
Client:
Shane Yanagisawa - Project Manager
(360) 606-4375

Scope Of Work

A joint effort between our electrical and civil divisions, our work included nearly 1 mile of Pepco High Voltage Ductbanks with significant safety supervision, 9 conduits encased in concrete, 14 electric manholes through RFK parking lot to serve one of the drilling operations for the DC Clean Rivers project, and restoration of the surface. As of early July 2014, the ductbank work was almost complete. Our team backfilled their trenches and final paving occurred mid-July to restore and extend the surface. Two electricians will remain on site for 3-5 years beyond the base contract dates to provide continuous support as needed like data/communication lines. 

Project Images

#
#
#
#
Share URL copied!
https://www.thebluebook.com/iProView/798674/fort-myer-construction-corp/subcontractors/
Facebook
X
LinkedIn
Request Brochure

We will send a link to your email address that will download our FREE PDF brochure.